You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
The sd-list component still has status: experimental in the docs and the components sd-tab-group and sd-link are missing the status at all.
Expected behavior
All 3 components are set to status: stable with the correct version number since they are stable being added.
Steps to reproduce
Technical Information
The git-file-history needs to be inspected in order to find the version number since which they are stable. If the correct version number is not easily to be found, the last iteration on the component should be used as "stable".
DoR
Item has business value
Item has been estimated by the team
Item is clear and well-defined
Item dependencies have been identified
DoD
Documentation has been created/updated (if applicable)
Migration Guide has been created/updated (if applicable)
Relevant E2E tests (Features, A11y, Bug fixes) are created/updated
Relevant stories (Features, A11y) are created/updated
Implementation works successfully on feature branch
The text was updated successfully, but these errors were encountered:
Current behavior
The
sd-list
component still hasstatus: experimental
in the docs and the componentssd-tab-group
andsd-link
are missing the status at all.Expected behavior
All 3 components are set to
status: stable
with the correct version number since they are stable being added.Steps to reproduce
Technical Information
The git-file-history needs to be inspected in order to find the version number since which they are stable. If the correct version number is not easily to be found, the last iteration on the component should be used as "stable".
DoR
DoD
feature
branchThe text was updated successfully, but these errors were encountered: