-
Notifications
You must be signed in to change notification settings - Fork 18
Commit
This commit does not belong to any branch on this repository, and may belong to a fork outside of the repository.
- Loading branch information
Showing
21 changed files
with
1,380 additions
and
236 deletions.
There are no files selected for viewing
This file contains bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
This file contains bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
Loading
Sorry, something went wrong. Reload?
Sorry, we cannot display this file.
Sorry, this file is invalid so it cannot be displayed.
Loading
Sorry, something went wrong. Reload?
Sorry, we cannot display this file.
Sorry, this file is invalid so it cannot be displayed.
Loading
Sorry, something went wrong. Reload?
Sorry, we cannot display this file.
Sorry, this file is invalid so it cannot be displayed.
Binary file added
BIN
+44.6 KB
docs/src/assets/error_vs_spread_over_iteration_uki_compare_scheduler.png
Loading
Sorry, something went wrong. Reload?
Sorry, we cannot display this file.
Sorry, this file is invalid so it cannot be displayed.
This file contains bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
Original file line number | Diff line number | Diff line change |
---|---|---|
@@ -0,0 +1,74 @@ | ||
# [Learning Rate Schedulers (a.k.a) Timestepping](@id learning-rate-schedulers) | ||
|
||
## Overview | ||
|
||
We demonstrate the behaviour of different learning rate schedulers through solution of a nonlinear inverse problem. | ||
|
||
In this example we have a model that produces the exponential of a sinusoid ``f(A, v) = \exp(A \sin(t) + v), \forall t \in [0,2\pi]``. Given an initial guess of the parameters as ``A^* \sim \mathcal{N}(2,1)`` and ``v^* \sim \mathcal{N}(0,5)``, the inverse problem is to estimate the parameters from a noisy observation of only the maximum and mean value of the true model output. | ||
|
||
We shall compare the following configurations of implemented schedulers. | ||
1. Fixed, long timestep `DefaultScheduler(0.5)` - orange | ||
2. Fixed, short timestep `DefaultScheduler(0.02)` - green | ||
3. Adaptive timestep (designed originally to ensure EKS remains stable) `EKSStableScheduler()` [Kovachki & Stuart 2018](https://doi.org/10.1088/1361-6420/ab1c3a) - red | ||
4. Misfit controlling timestep (Terminating) `DataMisfitController()` [Iglesias & Yang 2021](https://doi.org/10.1088/1361-6420/abd29b) - purple | ||
5. Misfit controlling timestep (Continuing beyond Terminate condition) `DataMisfitController(on_terminate="continue")` - brown | ||
|
||
|
||
## Timestep and termination time | ||
|
||
Recall, for example for EKI, we perform updates of our ensemble of parameters ``j=1,\dots,J`` at step ``n = 1,\dots,N_\mathrm{it}`` using | ||
|
||
`` \theta_{n+1}^{(j)} = \theta_{n}^{(j)} - \dfrac{\Delta t_n}{J}\sum_{k=1}^J \left \langle \mathcal{G}(\theta_n^{(k)}) - \bar{\mathcal{G}}_n \, , \, \Gamma_y^{-1} \left ( \mathcal{G}(\theta_n^{(j)}) - y \right ) \right \rangle \theta_{n}^{(k)},`` | ||
|
||
where ``\bar{\mathcal{G}}_n`` is the mean value of ``\mathcal{G}(\theta_n)`` | ||
across ensemble members. We denote the current time ``t_n = \sum_{i=1}^n\Delta t_i``, and the termination time as ``T = t_{N_\mathrm{it}}``. | ||
|
||
!!! note | ||
Adaptive Schedulers typically try to make the biggest update that controls some measure of this update. For example, `EKSStableScheduler()` controls the frobenius norm of the update, while `DataMisfitController()` controls the Jeffrey divergence between the two steps. Largely they follow a pattern of scheduling very small initial timesteps, leading to much larger steps at later times. | ||
|
||
There are two termination times that the theory indicates are useful | ||
- ``T=1``: In the linear Gaussian case, the ``\{\theta_{N_\mathrm{it}}\}`` will represent the posterior distribution. In nonlinear case it should still provide an approximation to the posterior distribution. Note that as the posterior does not necessarily optimize the data-misfit we find ``\bar{\theta}_{N_\mathrm{it}}`` (the ensemble mean) provides a conservative estimate of the true parameters, while retaining spread. It is noted in [Iglesias & Yang 2021](https://doi.org/10.1088/1361-6420/abd29b) that with small enough (or well chosen) step-sizes this estimate at ``T=1`` satisfies a discrepancy principle with respect to the observational noise. | ||
- ``T\to \infty``: Though theoretical concerns have been made with respect to continuation beyond ``T=1`` for inversion methods such as EKI, in practice we commonly see better optimization of the data-misfit, and thus better representation ``\bar{\theta}_{N_\mathrm{it}}`` to the true parameters. As expected this procedure leads to ensemble collapse, and so no meaningful information can be taken from the posterior spread, and the optimizer is not likely to be the posterior mode. | ||
|
||
## The experiment with EKI & UKI | ||
|
||
We assess the schedulers by solving the inverse problem with EKI and UKI (we average results over 100 initial ensembles in the case of EKI). We will not draw comparisons between EKI and UKI here, rather we use them to observe consistent behavior in the schedulers. Shown below are the solution plots of one solve with each timestepper, for both methods. | ||
|
||
![Solution EKI](assets/ensemble_compare_scheduler.png) ![Solution UKI](assets/ensemble_uki_compare_scheduler.png) | ||
|
||
*Top: EKI, Bottom: UKI. Left: The true model over ``[0,2\pi]`` (black), and solution schedulers (colors). | ||
Right: The noisy observation (black) of mean and max of the model; the distribution it was sampled from (gray-ribbon), and the corresponding ensemble-mean approximation given from each scheduler (colors).* | ||
|
||
To assess the timestepping we show the convergence plot against the algorithm iteration we measure two quantities. | ||
- error (solid) is defined by ``\frac{1}{N_{ens}}\sum^{N_{ens}}_{i=1} \| \theta_i - \theta^* \|^2`` where ``\theta_i`` are ensemble members and ``\theta^*`` is the true value used to create the observed data. | ||
- spread (dashed) is defined by ``\frac{1}{N_{ens}}\sum^{N_{ens}}_{i=1} \| \theta_i - \bar{\theta} \|^2`` where ``\theta_i`` are ensemble members and ``\bar{\theta}`` is the mean over these members. | ||
|
||
![Error vs spread EKI](assets/error_vs_spread_over_iteration_compare_scheduler.png) ![Error vs spread UKI](assets/error_vs_spread_over_iteration_uki_compare_scheduler.png) | ||
|
||
*Top: EKI. Bottom: UKI. Left: the error and spread of the different timesteppers at over iterations of the algorithm for a single run. | ||
Right: the error and spread of the different timesteppers at their final iterations, (for EKI, averaged from 100 initial conditions).* | ||
|
||
Finding the Posterior (terminating at ``T=1``): | ||
- DMC with termination (purple), closely mimics a small-fixed timestep (green) that finishes stepping at ``T=1``. Both retain more spread than other approaches, and DMC is far more efficient, typically terminating after around 10-20 steps, where fixed-stepping takes 50. We see that (for this experiment) this is a conservative estimate, as continuing to solve (e.g. brown) until later times often leads to a better error while still retaining similar "error vs spread" curves (before inevitable collapse). This is consistent with the concept of approximating the posterior, over seeking an optimizer. | ||
- The behavior observed in UKI is similar to EKI | ||
|
||
Optimizing the objective function (continuing ``T \to \infty``): | ||
- Large fixed step (orange). This is very efficient, but can get stuck when drawn too large, (perhaps unintuitive from a gradient-descent perspective). It typically also collapses the ensemble. On average it gives lower error to the true parameters than DMC. | ||
- Both EKSStable and DMC with continuation schedulers, perform very similarly. Both retain good ensemble spread during convergence, and collapse after finding a local optimum. This optimum on average has the best error to the true parameters in this experiment. They appear to consistently find the same optimum as ``T\to\infty`` but DMC finds this in fewer iterations. | ||
- The UKI behavior is largely similar to EKI here, except that ensemble spread is retained in the ``T\to\infty`` limit in all cases, from inflation of the parameter covariance (``\Sigma_\omega``) within our implementation. | ||
|
||
### DMC as a default in future? | ||
|
||
This experiment motivates the possibility of making DMC (with/without) continuation a default timestepper in future releases, for EKI/SEKI/UKI. | ||
|
||
Currently we will retain constant timestepping while we investigate further, though the DMC is available for use. | ||
|
||
Please let us know how you get on by setting the keyword argument in EKP | ||
```julia | ||
scheduler = DataMisfitController() # terminating | ||
scheduler = DataMisfitController(on_terminate = "continue") #non-terminating | ||
``` | ||
|
||
!!! warning "Ensemble Kalman Sampler" | ||
We observe blow-up in EKS, when not using the `EKSStableScheduler`. | ||
|
This file contains bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
This file contains bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
Original file line number | Diff line number | Diff line change |
---|---|---|
@@ -0,0 +1,5 @@ | ||
[deps] | ||
ColorSchemes = "35d6a980-a343-548e-a6ea-1d62b119f2f4" | ||
Distributions = "31c24e10-a181-5473-b8eb-7969acd0382f" | ||
EnsembleKalmanProcesses = "aa8a2aa5-91d8-4396-bcef-d4f2ec43552d" | ||
Plots = "91a5bcdd-55d7-5caf-9e0b-520d859cae80" |
Oops, something went wrong.