Skip to content

S7 1200 1500 Notes

农码一生 edited this page May 30, 2022 · 1 revision

来源:https://github.com/S7NetPlus/s7netplus/wiki/S7-1200-1500-Notes#s7-12001500-notes

This is taken directly from Snap7 documentation: http://snap7.sourceforge.net/

S7 1200/1500 Notes

An external equipment can access to S71200/1500 CPU using the S7 “base” protocol, only working as an HMI, i.e. only basic data transfer are allowed. All other PG operations (control/directory/etc..) must follow the extended protocol, not (yet) covered by Snap7. Particularly to access a DB in S71500 some additional setting plc-side are needed.

  1. Only global DBs can be accessed.
  2. The optimized block access must be turned off.
  3. The access level must be “full” and the “connection mechanism” must allow GET/PUT.

Let’s see these settings in TIA Portal V12 DB property Select the DB in the left pane under “Program blocks” and press Alt-Enter (or in the contextual menu select “Properties…”) Uncheck Optimized block access, by default it’s checked. protection

Protection

Select the CPU project in the left pane and press Alt-Enter (or in the contextual menu select “Properties…”) In the item Protection, select “Full access” and Check “Permit access with PUT/GET ….” as in figure.

protection2

Create new page

Clone this wiki locally